Hospitality
Boutique Hotel Refresh
Phased refresh of 4 corridors and 48 guest rooms — wall repair, repaint, door frame upgrades, new colour palette, and low-odor systems for an occupied hotel.


Location
Athens Centre, Boutique Hotel
Duration
3 weeks (night shifts)
Area
48 rooms + 4 corridors
Client
4★ Boutique hotel
Challenge
The hotel had to remain fully open with guests in house. Corridors showed wear, dated colours, and constant 24/7 foot traffic.
Approach
We ran night shifts floor by floor, protected carpets and lifts, phased room work around checkout flow, and completed daily sign-off with the duty manager.
Scope of Work
Phased refresh of 4 corridors and 48 guest rooms — wall repair, repaint, door frame upgrades, new colour palette, and low-odor systems for an occupied hotel.
Materials & Systems
Scrubbable hotel-grade paints, low-VOC systems, durable finishes for high traffic, and protective materials for carpets and surfaces.
Project Highlights
- 48 rooms completed with zero hotel closure
- Night shifts — no guest disruption
- New colour palette for a premium feel
- Floor-by-floor delivery with QA checklist
Results
Zero operational disruption. All rooms and corridors were refreshed on schedule with no negative reviews or check-in delays.