Skip to content
PAINT4U
← All projects

Hospitality

Boutique Hotel Refresh

Phased refresh of 4 corridors and 48 guest rooms — wall repair, repaint, door frame upgrades, new colour palette, and low-odor systems for an occupied hotel.

Boutique Hotel Refresh - After
Boutique Hotel Refresh - Before
BeforeAfter

Challenge

The hotel had to remain fully open with guests in house. Corridors showed wear, dated colours, and constant 24/7 foot traffic.

Approach

We ran night shifts floor by floor, protected carpets and lifts, phased room work around checkout flow, and completed daily sign-off with the duty manager.

Scope of Work

Phased refresh of 4 corridors and 48 guest rooms — wall repair, repaint, door frame upgrades, new colour palette, and low-odor systems for an occupied hotel.

Materials & Systems

Scrubbable hotel-grade paints, low-VOC systems, durable finishes for high traffic, and protective materials for carpets and surfaces.

Project Highlights

  • 48 rooms completed with zero hotel closure
  • Night shifts — no guest disruption
  • New colour palette for a premium feel
  • Floor-by-floor delivery with QA checklist

Results

Zero operational disruption. All rooms and corridors were refreshed on schedule with no negative reviews or check-in delays.

CallQuote